St Fintans Hospital Portlaoise – Enabling Works

Description of Works

 

This involved the complete renovation of the roof of the North wing.

First all asbestos based material including floor coverings and adhesive, gaskets, sanitary ware etc were removed by specialists’.

Again all copper parapets, gutters, valleys and flashings were replaced, CI rainwater goods refurbished with a considerable amount of work carried out to the existing roof members that showed signs of decay where segments of the members were removed, new segments spliced in and all areas treated for wet/dry rot.

125 aluminium windows were removed and replaced with new timber up and down sash windows to restore the original look of the building.

25 existing timber sash windows were restored and refitted and 10 no steel sash windows were restored.

2 no flat roofs were insulated and recovered.

Programme of Works: 9 months

Client: Health Service Exceutive

Architect: RKD Architects

Project Supervisor Design Process: ORS

Civil & Structural Engineer: Roughan & O’Donovan Consulting Engineers

Quantity Surveyors: McGahon Surveyors

Mechanical & Electrical Engineer: RPS Engineers

Conservation Consultant: Carrig Conservation International Ltd.